Article

Where To Nail Starter Shingles

How can I start my first row of slats?

Line up a row of starters at the bottom of the roof along the edge. Place the nails in the three tabs about six inches above the cutouts, near where the pin meets the top of the sleeve. However, be careful not to nail the tar strips.

If so, where do you place the single initial?

Starting tiles should be installed on ALL edges of the roof. To comply with the regulations it is technically necessary to mount it only on the lower eaves, but the installation has great advantages also in the tear-off edges (eg gable edges).

Second, what do you put under the clapboard?

Felt paper, also called tar paper or cardstock, helps drain water that gets under the shingles, protects asphalt shingles from wood deck resin, increases the fire resistance of the roof, and helps keep the house dry when it rains during work.

With this in mind, overlap the starting tiles?

With the shingle along the edge of the roof, also lay a set of shingles on the sides of the roof.

👉 For more insights, check out this resource.

Do architectural shingles need a starting list?

Yes they do it. As discussed above, a key requirement for starter shingles is that they have a seal on the underside of the shingles (or on the outer edge near the rake). Leading Edge Plus starter shingles have aggressive IKO Fastlock sealing strip on each piece to improve overall roof performance.

Is it necessary to remove the plastic strip on the back of the clapboard?

No, leave the tape alone: ​​In response to a common reader question, not normal: According to roofing manufacturers, it is not necessary to remove the cellophane tape from the back of the roof tiles before nailing them.

👉 Discover more in this in-depth guide.

What is a Roofer Entry List?

Starting shingles (also called starting lists) are an important part of your new roofing system. A starter strip is an asphalt-based shingle that is used to seal the roof of your home and break the edges under a roof.

Do you need a starting stone?

The starting list is essential as it adheres to the shingles on the edges of the roof and protects them from the elements. The more protection you can have on the edges of your roof, the better, and the shingles on the starter list provide that all-important extra protection.

How long do I have to stop the initial wink?

Most manufacturers recommend a custom pyramid pattern where the entrances are cut from two boards – a 21-inch one. Length and 15 inches. 3 feet length. single and 28 inch.

How many beginner tiles do I need?

Overview. Owens Corning® Starter Shingle saves time by eliminating the need to cut shingles to create a starting row. It is packaged in two pieces, 16 shingles per pack. The continuous seal ensures an effective seal between the starter motor and the first layer of shingles.

How far should the tiles hang from the edge of the drip tray?

The edge of the boards should hang between an inch and an inch above a ceiling – or an inch and an inch if the drip tray is installed. Too much overhang and shingles can fly off in strong winds. Too little water can enter the rakes or panels.

Can you overlap the tiles?

When applying the new tiles, each individual layer is covered with a flashing step. There are two simple rules to follow: each flash must overlap the lower one by at least 75 mm (3 ″), but not be visible during the upper rotation of the single.

How many feet are there in a pile of emerging shingles?

105

How many squares of shingle do I need for my roof?

Roof areas are measured in squares – one square equals 100 square feet of roof. To find the number of squares on the gable roof above, divide a total of 24,000 square feet by 100 (24,000 ÷ 100 = 240). This means that you will need 240 squares of shingle to cover this roof.

How is the drip tray installed?

Correct installation of the drip tray Fit the roof drip along the drip, lay the floor and then lay the drip along the facade. It is best to place the gutter along the gutter first, then place an ice and water barrier (in winter tires) or felt paper (substrate) on the edge of the gutter.

How can I install new tiles on old tiles?

Some roofers install a layer of waterproof shingles (WSU) over existing shingles, as they would a bare shingle roof. This provides additional protection against ice ponds. Asphalt shingles can be laid on cedar or shingles, a task best left to the professionals.

What’s the fastest way to get started?

Re: Faster Shingles Tips Learn how to place shingles in many positions and back and forth, left and right. Sit in a stepped pattern and cut the clapboard as you go, start and finish. Place the beams 4 feet high and 4 feet apart all over the roof before starting. Get a rhythm (sp) on the nail.

Where To Nail Starter Shingles